Equipment testing
May 10, 2011
The thermal-vacuum tests of the device IMISS-1 is carried out as a part of the technological try-out .
Equipment testing
April 27, 2011
TUS flying prototype composite mirror hub was coated with reflecting composite material. The product quality is being tested.
Equipment testing
April 25, 2011
Thermal-vacuum tests of the technical model of BDRG device were started.
Resourse tests
April 18, 2011
The resourse tests of scientific equipement blocks are going on.
Delivery of weight-dimension and thermal models
April 12, 2011
The weight-dimension and thermal models of scientific equipment blocks of the spacecraft are delivered to R&D Institute of Electromechanics – NIIEM (Istra, Russia).
Meeting in Republic of Korea
March 29, 2011
A meeting of Russian and foreign scientists was held in EWHA Women University (Seoul, Republic of Korea). Discussed issues related to the flight model of UFFO device. The scientific equipment systems were joined with UFFO block.
Collaboration MSU-UCLA
March 16, 2011
Last week a representative of UCLA University – member of Lomonosov collaboration – visited MSU. During the visit ELFIN-L device was refined and realization of the experiment within cooperation frames was discussed.
Equipment testing
March 12, 2011
The thermal testing of DEPRON device nodes has been caried out successfully.
Footprints approval
February 9, 2011
Footprints of scientific payload blocks and electric diagrams of their connections (E5 and E6) are completely approved.
Equipment testing
January 18, 2011
Thermal-vacuum tests of the device ShOK were started.